
BALLIANA CLIENTS
CARBON SEQUESTRATION POTENTIAL

AREAS ANALYZED
2024




2023




ATTENTION: THE STUDY OF CARBON SEQUESTRATION POTENTIAL WAS CARRIED OUT ON THE GEOGRAPHICAL COORDINATES EXISTING IN THE DOCUMENTS PROVIDED BY THE INTERESTED PARTY OR BY GEOREFERENCE FILES.
GREENLINE IS NOT RESPONSIBLE FOR THE DOCUMENTARY ANALYSIS OF THE STUDY AREA AND THEREFORE EXEMPT FROM ANY DIFFERENCE OR INCONSISTENCY IN THE LIMITATIONS INFORMED IN SUCH DOCUMENTS OR FILES PROVIDED FOR STUDY.
GREENLINE IS NOT RESPONSIBLE FOR THE VERACITY OF THE DOCUMENTATION RECEIVED FOR ANALYSIS, WHICH IS THE SOLE RESPONSIBILITY OF ITS OWNER.
THE PROJECTION PROVIDED IS OF THE CARBON SEQUESTION POTENTIAL OF THE EXISTING VEGETATION OVER THE AREA OF INTEREST, CALCULATED ON THE EXISTING VEGETATION, HOWEVER IT MAY VARY SUBSTANTIALLY IF THERE ARE CHANGES IN THE VEGETATION AFTER THE STUDY DATE, FOR REASONS OF FIRE, DEFORESTATION, WATERFALL, DROUGHT, CHANGES IN BIOMASS FOR ANY REASON.
THE OCCURRENCE OF FIRES IN PERIODS PAST THE PROJECTION MAY CANCEL OR EVEN MAKE THE RESULTS NEGATIVE (CO2 EMISSIONS HIGHER THAN SEQUESTRATION).
IN THIS PROJECTION WE DO NOT PERFORM AN ANALYSIS OF THE EXISTENCE OF FIRES PREVIOUS TO THE DATE OF THIS STUDY
THIS STUDY IS VALID FOR 15 DAYS FROM ITS DELIVERY, EXCEPT IN CASES WHERE CHANGES OCCUR IN VEGETATION DURING THIS PERIOD.